Products
Construction Products
 
Kryton Crystalline Products
 


KRYSTOLTM CONCRETE WATERPROOFING SYSTEM

Zenith Corporate Park
Kelana Jaya, Malaysia

BACKGROUND
The Zenith Corporate Park development in Kelana Jaya, Malaysia, is slated to be the city’s leading business centre. This nine acre, fully integrated commercial district is designed to accommodate Kelana Jaya’s expanding commercial activities. Through its combination of residential units, office facilities and retail spaces; it will offer residents a one-stop centre to fulfill the dreams of an urban lifestyle for all in Kelana Jaya.

Zenith Corporate Park has a total floor space of more than 1,000,000 ft2. This includes 80 lots of 3 & 4 story retail/office units with lifts, two blocks of serviced apartment with a retail podium, one corporate tower and more than 1,800 parking spots.

When selecting concrete waterproofing systems, the project team had several key concerns. First, given the project’s scope and timeline, affordability and ease of application were critical. Knowing that some concrete waterproofing systems deteriorate over time, they wanted a system that would be long lasting to minimize future repair costs and inconvenience to tenants and their patrons.

SOLUTION
After considering several options, the project team selected Kryton’s Krystol Concrete Waterproofing System. The Krystol system uses advanced integral crystalline waterproofing technology to transform porous concrete into a permanent, water-resistant barrier. It provides a guaranteed defense against water damage and steel reinforcement corrosion.

When combined with water and concrete, Krystol causes millions of needle-like crystals to grow and spread throughout concrete, filling the spaces between concrete particles and permanently blocking the movement of water and waterborne contaminants. If cracks form later on, incoming water causes additional crystals to grow again, filling the cracks and ensuring that the structure's waterproofing barrier is protected.

The Krystol Concrete Waterproofing System eliminates the need for external waterproofing membranes, which saves construction time and costs. It provides maximum flexibility and can be used any time before, during or after the construction process. Unlike external waterproofing membranes, Krystol will not deteriorate – it’s guaranteed to last the lifetime of the structure. The Krystol Concrete Waterproofing System includes:

•Krystol Internal Membrane™ (KIM®), an admixture suitable for new concrete construction.
•The Krystol Waterstop System™, an advanced joint design system that provides both physical and chemical waterproofing barriers.

More than 67,000 kg of KIM, and 12,800 m3 of KIM-treated concrete were used in the basement slabs and elevator pits of Zenith Corporate Park. Plus, the Krystol Waterstop system was used to treat 1,500 metres of joints in the retaining walls and basement slab-to-slab areas.

Zenith Corporate Park is scheduled for completion in mid-2009.

PRODUCT
Krystol Concrete Waterproofing System

LOCATION
Kelana Jaya

OWNER
Perantera Properties Sdn Bhd

DISTRIBUTOR
Rovski Sdn Bhd

CONTRACTOR
Pembinaan AntaraBina Sdn Bhd

More than 67,000 kgs of KIMl® were used for the basement slabs and elevator pits.
Construction site at Zenith Corporate Park
Artist rendering of completed project