All the leakage points were treated and repaired one by one utilizing Krystol Crack repair system to stop the flowing water as shown. The leakage points continued to shift during the repair treatment due to high hydrostatic pressure.
The water leakage from all the leaking points was totally stopped after 12 days. Unlike previous attempts with the other materials, the Kryton system worked as specified to stop the leaking water. To date the system is performing as specified.
PRODUCT
Krystol Crack Repair System
APPLICATOR
DicoTech
OWNER
Ms Khalid Tahir Zinal
CONTRACTOR
Ashiyana Contracting
LOCATION
Mamzar, Dubai, United Arab Emirates (U.A.E.)
CONSULTANT
Al Takamul Al handasi Consultants
DISTRIBUTOR
Giant Star Trading L.L.C.(GST)
|