By eliminating the need for external waterproofing membranes, the Krystol Concrete Waterproofing System saves construction time and costs. It provides maximum flexibility and can be used any time before, during or after the construction process.
Unlike external waterproofing membranes, Krystol will not deteriorate – it’s guaranteed to last the lifetime of the structure. The Krystol Concrete Waterproofing System includes:
More than 55,000 kg (121,252 lbs) of KIM, and 7,250 m3 (9.483 cubic yards) of KIM-treated concrete were used in the basement slabs and elevator pits of KK Times Square Phase One.
In excess of 25,000 kg (55,115 lbs) of Krystol T1/T2 was used to the elevated car ramps and pedestrian walkways, drainage areas and rooftops around the 12 Phase One buildings.
And 2,400 m (7,874 ft) of joints in the retaining walls and basement slab-to-slab areas were treated with the Krystol Waterstop System.
KK Times Square Phase One is scheduled for completion in mid-2007.
PROJECT NAME
KK Times Square, Phase One
LOCATION
Kota Kinabalu, Sabah, Malaysia
DEVELOPER
Syarikat Kapasi Sdn. Bhd.
CONSULTING ENGINEER
Inovatif Jurutera Perunding Sdn. Bhd.
ARCHITECT
Arkitek Billings Leong & Tan Sdn. Bhd.
CONTRACTOR
RDS Bina Sdn. Bhd.
KRYTON DISTRIBUTOR
Concrete & Waterproofing Technology Sdn. Bhd. and Rovski Technology Sdn. Bhd.
|