Elevator Pits Project List
|
| SKIEL MOUNTAIN WATER RESERVOIR |
 |
| Location: |
Skiel Mtn., Seton Lake, BC, Canada |
| Date: |
March, 2001 |
| Product: |
KIM - Krystol Internal Membrane |
| Contractor: |
David Nairne & Associates Ltd. |
| Engineer: |
NewHaven Construction |
| Ready-mix: |
Tri-B Concrete |
| Solution: |
Located in a remote area of BC, a mobile batch plant was required. Despite adverse construction conditions the structure is watertight without the use of membranes or surface applied sealants. |
|
| TACHET WATER TREATMENT PLANT |
 |
| Location: |
Lake Babine, BC, Canada |
| Date: |
1999 |
| Product: |
KIM - Krystol Internal Membrane |
| Engineer: |
David Nairne & Associates Ltd. |
| Contractor: |
General: QQR Mechanical |
| Ready-mix: |
Concrete: Stokes Construction |
| Solution: |
"We have built a lot of water retaining structures and found that there is always some leaks and damp spots after the tanks are filled and it was nice to see the leaks and damp spots cure themselves after a short period of time," Chris Stokes, Stokes Construction. |
|
| HARTLEY BAY WATER RESERVOIR |
 |
| Location: |
Prince Rupert, BC, Canada |
| Date: |
1999 |
| Product: |
KIM - Krystol Internal Membrane |
| Engineer: |
Kerr, Wood, Leidel & Associates |
| Contractor: |
General: Edvan Construction |
| Ready-mix: |
Concrete: Knutsen Holdings |
| Solution: |
The water treatment facility built for the Hartley Bay Band Council is performing as specified and will provide a permanently watertight reservoir. |
|
| SKOOKUMCHUK WATER RESERVOIR |
 |
| Location: |
Bellingham, WA, USA |
| Date: |
April, 2001 |
| Product: |
KIM - Krystol Internal Membrane |
| Contractor: |
Mount Baker Silo |
| Ready-mix: |
Ferndale Ready-mix |
| Solution: |
Reservoir was built in seven lifts with steel ring forms. The tank was filled almost immediately and has been in service since June 2001. |
|
| CONNECTICUT WATER RESERVOIR |
 |
| Location: |
Norwalk, Connecticut, USA |
| Date: |
March 1999 |
| Product: |
KIM - Krystol Internal Membrane |
| Contractor: |
Tri Star Building Corporation |
| Ready-mix: |
O & G Industries |
| Solution: |
The performance of the KIM concrete has been easy to monitor as this water tank was built indoors to service a local mall. Since March 1999, the structure shows no signs water dampness, leaks or seepage of any kind. |
|
| JFK PUMP STATION |
 |
| Location: |
JFK Airport, New York, USA |
| Date: |
March 1999 |
| Product: |
KIM - Krystol Internal Membrane |
| Contractor: |
Lotus Construction Co. |
| Ready-mix: |
Seville Central Mix, Freeport, NY |
| Solution: |
15" concrete walls and suspended roof slab were constructed with KIM concrete. To date, the pump house concrete is dusty dry and performing as specified. |
|
|
|