Coquihalla Highway Bridges
British Columbia, Canada

CHALLENGE
In 1985 and 1986, thirteen bridges on the newly constructed Coquihalla Highway required waterproofing treatment for the existing concrete infrastructure to protect the reinforcing steel from corrosion. Most of the bridges were constructed and treated during adverse winter weather conditions.

PERFORMANCE
The Krystol T1 and T2 waterproofing system was the only system compatible for wet weather application. The treatment was applied to both the vertical and horizontal concrete surfaces. The system continues to perform as specified.

LOCATION
Coquihalla Highway, Coastal Mountain Range British Columbia, Canada

OWNER
Government of British Columbia

APPLICATOR
Goodbrand Construction, Miller Construction, Dawson Construction

ENGINEER
B.C. Department of Highways

Bridges receive constant de-icing salt applications 6 months out of the year.